Extensions & Renovations

Working into an existing house is a different trade to building a new one. Nothing is square, nothing is documented, and half the job is what you find once the linings come off.

Typical program
14 – 30 weeks
Live-in staging
Available
Contract
Fixed price
Structural warranty
6 years

Overview

The honest version of "we'll know once we open it up".

Every renovation quote in the country contains that sentence. The difference is what a builder does about it. We do investigative work before we price — lift floorboards, open a section of ceiling, check the stumps, look at the switchboard and the drainage — so the unknowns are a short list, not a blank cheque.

What we genuinely can't see until demolition gets quoted as a named, capped allowance with the assumption written next to it. If we don't spend it, you don't pay it.

A renovation contract with six open provisional sums isn't a fixed price. It's an invitation.

Second storeys and rear additions

Adding on top of an existing house means the existing structure has to carry it. That is an engineering question first and a building question second, and it decides whether the job is sensible before anyone talks about kitchens.

  • Structural assessment of existing footings, stumps and wall framing before design is fixed
  • Temporary weatherproofing so the house stays dry while the roof is off
  • Steel beams and posts sized by an engineer, installed and inspected before load transfer
  • New work tied into old with the level differences resolved properly, not packed out
  • Matching brickwork, render and roofing sourced and sampled before it's ordered

Living in the house while we work

Most of our clients do. It adds a few weeks and changes the sequence, so we price it that way from day one rather than discovering it halfway through.

  • Sealed dust screens with zip access, replaced when they stop sealing
  • A working kitchen and at least one working bathroom maintained at all times
  • Protected access to the parts of the house you're still using
  • Site swept and made safe at the end of every day — not just before an inspection
  • Agreed working hours, because you also live here

Kitchens, bathrooms and internal reworks

Wet areas are where cheap renovations fail. Waterproofing gets inspected and photographed before a single tile goes down, falls get checked with a level and water, and the joinery is measured on site after framing — never off the drawing.

Included

What sits inside the contract.

Investigative works

Selective opening-up before pricing, so the unknowns are a short named list.

Demolition & make-safe

Strip-out, propping and temporary weatherproofing, with waste sorted and removed.

Structural alterations

Engineered steel, new footings and load transfer inspected before linings go back on.

Services upgrades

Switchboard, wiring, plumbing and drainage brought up to current requirements.

Waterproofing

Inspected and photographed before tiling, with the certificate in your handover folder.

Live-in staging

Dust screens, a working kitchen and bathroom, protected access, daily clean-down.

How it runs

Four stages, no surprises in the middle.

01

Walk-through

We look at what's there, what you want, and what the house will actually allow.

02

Investigate & price

Selective opening-up, engineering advice where needed, then a fixed price with named allowances.

03

Approvals & staging

Permits sorted and the sequence agreed around how you'll keep using the house.

04

Build & handover

Weekly photo reports, a joint walkthrough, and defects closed before we demobilise.